Demolition Regional VIC.

Get a free quote.

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form

Demolition Regional VIC.

Regional VIC Demolition – Maccas Demolition is your number-one choice!

Maccas Demolition has always served the Regional Vic community. But now, with service yards in Echuca Ballarat and Geelong, Maccas can provide high-quality demolition services throughout Vicotria.

demolition services

A Regional Vic Demolition Contractor with ISO certification

Maccas Demolition is ISO-certified in Quality, Environment, and OH&S. This internationally recognised certification shows our clients that their needs will be met from quote to final documentation.

Maccas Has always been a Regional VIC Demolition contractor!

Maccas has operated throughout Victoria for over 15 Years! Performing demolitions for owner builders and tier two commercial builders alike. We provide the documentation and performance capability big builders need, with the service quality small customers love!

 

Regional VIC Demolition Projects By Maccas Demolition!

Maccas has demolished buildings in over 20 different Victorian towns each year, including but not limited to the following;

The knowledge of the requirements for rural demolition in VIcoria is why Maccas is your number-one demolition expert in the bush!

 

 

ENQUIRE TODAY

Browse Demolitions in Regional VIC.

Ogilvie Av House Demolition Echuca.

Suburb

Echuca

Size

117m2

Timeline

9 Days

What was needed for this Echuca House Demolition?  This project required a clear block to make the most of the 1400m2 block.

To do this, Maccas Demolition obtained the Demolition permit. Bayside required only a Letter of Appointment from the client, while Maccas organised all other documents, including the 29a( form Campaspe Shire), site plan, and all requirements from a registered building surveyor to obtain a demolition permit.

While the permit was being obtained, the house was checked for asbestos. The house was built in the 1970s but had had some renovations throughout its time, so samples were taken in cases where it could not be determined if the cement sheets were asbestos.

Unfortunately, several of the tests were positive, so the asbestos removal notification was lodged with WorkSafe Victoria.

The Asbestos and all other hazardous materials were removed before the Demolition commenced. Once the asbestos clearance was issued, the demolition started.

The Demolition was Completed using a 13-ton excavator, which separated the recyclable materials on site. Under 90% of the total tonnage removed from the site went to recycling.

 

 

Project Details

Get a free quote.

Located in Echuca, Maccas Demolition offers a free quote/no-obligation inspection and assessment for every project.

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form